    SSE is one of the UK’s largest energy providers and is the largest generator of electricity from renewable sources in the UK...


    Renewables Industry2 AdobeStock_639801017

     

    guerbet-logo-vector

    Huge new capacity
    SSE has a wide variety of assets around the UK and Ireland and is heavily involved in renewable energy development worldwide. Its assets include over 2.5GW of offshore wind generation, with a further 9GW of offshore capacity in development—which includes the world’s largest turbines at Dogger Bank. SSE also has 1.25GW of onshore wind generation at more than 20 sites and 8 major hydroelectric schemes.

    With their focus on renewable generation, and significant pipeline of new generation projects, SSE needed their EAM system to provide more flexibility. 

    Importance of Mobility


    worker with mobile device BPD_547030955Crucially, they needed their engineers to be able to utilise the EAM from wherever they were working, which could be at very remote sites.

    Through a series of workshops with the various stakeholders and different business units, it became clear that mobility was a key issue for SSE, and would become more important as time went on.


    Drive towards Net Zero

    Workshops helped identify the key issues for the different business units, and our engineers, in collaboration with SSE’s IT and change management teams, put together a solution that accommodated all of these requirements.

    This has helped drive user adoption throughout the business, with a realisation at all levels that digital transformation is a key element in SSE’s drive for net zero.


    Rapid Adoption

    SSE’s cloud implementation of Maximo means they are able to access new features as soon as they become available, with the assurance that the system is absolutely robust. The cloud implementation of Maximo also helps to enable their mobility requirements, by providing more reliable uptime and remote accessibility.

    SSE have rolled out Fingertip to their remote engineers, who are working on hydro, offshore wind, onshore wind, solar, and legacy assets in a wide range of challenging locations.

     

    What the client said:

    “Working with a key partner who had a broad understanding of the asset management objectives we were trying to achieve, was really helpful in forming a collaborative team. 

    They had a great understanding of the business; knowing the technical solution very well, understanding asset management, and how the solution would relate to the business users. Being involved in workshops with them, and their understanding of the requirements was what really set things apart for me”

    undefined-Apr-18-2024-04-00-21-3797-PMLesleyanne Tuft, Head of IT Delivery, SSE


     