SSC Water & BPD Zenith – Smart Work Scheduling in Water Utilities
South Staffs & Cambridge Water – a large water supply company in the United Kingdom, helps reduce resource costs and increase performance after selecting IBM Business Partner BPD Zenith to implement their IBM Maximo upgrade.
Headquartered in Walsall, West Midlands, England, South Staffordshire Water (South Staffs Water) supplies high-quality drinking water to approximately 1.3 million people and approximately 35,000 commercial customers over 1,500 square km in the West Midlands, South Staffordshire, South Derbyshire, North Warwickshire and North Worcestershire areas.
The company consistently achieves its twin objectives of delivering high levels of customer service and low charges. Household customers have some of the lowest bills in England and Wales, while benefiting from the highest levels of customer service, as measured by its regulator Ofwat.
South Staffs and Cambridge Water was using IBM Maximo version 7.1 and an in-built system called Waterworks to manage its maintenance and overall asset management. As part of a major upgrade project, the client was looking to merge all maintenance routines into one central enterprise asset management (EAM) system, while updating that system and processes to ensure continued support and compliance in line with company policy and industry guidelines.
South Staffs Water opted for a managed approach by leveraging BPD’s MaxiCloud Solution. This offered South Staffs Water more flexibility and support, allowing them to host Maximo on their own infrastructure, while accessing BPD’s range of MaxiCloud enhancement tools, integrations, and add-ons, facilitating the potential benefits of IoT solutions. This would ensure both time-to-value, licensing and implementation costs would be fully optimized, to accelerate and increase ROI.
South Staffs Water could then take advantage of some of the latest technology and applications to optimize emergency/routine maintenance management and improve performance. This also gave the client the opportunity to modernize some of its ways of working those other previous versions could not cater to because of lack of functionality, such as mobile and scheduling.
Although the client already had two mobile solutions in place (Syclo & EZMaxMobile) and these were sometimes used to send out jobs and corresponding information, different areas had different processes, so jobs and information would often be delivered to engineers by email and over the phone. This was a very time consuming and inefficient use of resources, especially in tracking the progress of work, which was also a manual process.
Allocated jobs and Work Order information could only be ‘completed’ and updated in Maximo at the end of the day when the engineer returned to base, meaning they had to rely on notes and memory to update the Work Order accurately in Maximo. South Staffs Water wanted to align these processes and minimize the resource-heavy, manual input required, through automation and one single, effective mobile solution.
It was important to the client that it could provide the right data and information to the right people on the team, conveniently and securely. By incorporating an effective mobile solution, not only would the work information and job plans be easier to access, It could also drive a range of other improvements and enhancements, both for the engineer and to benefit performance/maintenance managers.
Working with IBM Business Partner BPD Zenith, South Staffs Water upgraded to IBM Maximo EAM 7.6.1.1. to connect its workforce with a mobile solution that would help improve data management and could take advantage of the latest techniques to help reduce resource costs and increase performance/completed job output.
BPD Zenith then looked at how this interaction with IBM Maximo translates to a smaller mobile screen. Desktop Maximo has plenty of ‘real estate’ to display a lot of information but with a mobile device, this has to be much more focused to ensure the essential information is clear and accessible. Simply ‘mirroring’ a desktop does not make for a pleasant/efficient user experience; instead, the user applications need to be configured to suit user needs by:
BPD Zenith leveraged the latest functionality from IBM Maximo and IBM Maximo Anywhere, along with IBM Maximo Spatial Asset Management, IBM Maximo Scheduler Plus and its associated applications (such as Graphical Scheduler, Graphical Assignment, Optimization Engine and Appointment Books) to offer an effective work prioritization solution. This considers service-level agreement (SLA) and engineer availability and incorporates manual appointment bookings, to automatically generate Work Orders and assign to the next available field service engineer efficiently.
BPD Zenith configured the associated IBM Maximo Scheduler Plus applications as follows:
BPD Zenith’s configuration of the IBM Maximo Scheduler Plus applications was significantly effective with these results:
When South Staffs Water removed predesignated geographical boundaries/areas, team productivity doubled. While this demonstrates the level of efficiency the system is capable of driving, it had a significant impact on operations while trying to keep up with the system. Changes are being made to enable the client to operate to this capacity, driving optimization even further.
The new solution helps South Staffs Water improve data management and could help it take advantage of the latest techniques to help reduce resource costs and increase performance/completed job output.
The number of jobs an engineer could perform were now optimized and automatically assigned; output increased dramatically, but the system was not considering the geographical location of the jobs and the travel that would be required between them – engineers would often have to return to the same remote location in the same day – this led to complaints from field-based resources and increased resource/fuel costs. BPD had to find a more efficient way of doing this…
The next step in the SSC journey was to integrate the optimization engine with Spatial / GIS so that the system could consider the location of jobs and the travel time between them. This will alleviate travel time issues and minimize fuel consumption while providing the same or even better performance from field resources.
By harnessing the GPS capabilities of engineer’s mobile devices, and by leveraging IBM’s Spatial Add-on for Maximo, Mark Parfitt – Developer at BPD Zenith, incorporated Spatial into the Work Prioritization project, configuring this to integrate with Bing/Google/Esri Maps and Scheduler Plus.
Spatial allows you to connect Bing/Google/Esri Maps to assets and work, to dynamically visualize the spatial relationships between your assets and mapped features, such as roads, buildings, pipelines, etc. By integrating Spatial and Bing/Google/Esri Maps with the optimization engine, distance and journey time data can then be considered as part of the prioritization and allocation process.
BPD continue to support SSC to be fully optimised along the road to Predict. Understanding the state and condition of their critical assets at any given time would allow SSC to manage and avoid potential supply problems and loss of service, while improving maintenance strategies and resource requirements.
LoveYourAsset connects SSC’s Underground Water Logger devices, to leverage the following data in Maximo:
By integrating LoveYourAsset with Maximo, SSC Water have a complete understanding of asset performance across their distribution network. They are aware of potential issues without having to rely upon customer response – issues can be auto-processed in a timely and accurate manner:
To find out more from BPD about the SSC project, Maximo Application implementation and upgrades, or LoveYourAsset, we would love to hear from you! You can get in touch with us HERE
Don’t forget to subscribe to receive the latest blogs, news and industry updates from BPD!